Our offices will close for Christmas at 1:00pm on Friday 19th December, reopening on Monday 5th January. Orders can still be placed online as normal but will be despatched as soon as we return.

Get a Quote
0
  • Description

    High performance spray adhesive used to bond the XPS, EPS & LoFix overlay floor panels to the subfloor. The spray adhesive is a fast and effective method that greatly reduces install times with no increase to height build up while minimising waste and overuse.

    When laying the overlay board to a wooden subfloor, simply spray the floor and apply the board to the glue, one board at a time. When laying onto wood a single can will cover 5sqm.

    When laying the boards to concrete or similar substrates with a high consumption rate, spray the floor and the underside of the board so you are bonding glue to glue. This method will give 2.5sqm coverage per can.

    Consumption Rate:

    Wooden subfloors: 5sqm/can
    Concrete subfloors: 2.5sqm/can

     

  • Manuals

    1. Prepare the subfloor by clearing all loose debris to ensure a true bond
    2. Read the instruction as stated on the can
    3. If laying the boards onto a wooden subfloor, spray the subfloor where the first board will be laid. If laying onto concrete, spray the back of the overlay board as well as the subfloor
    4. Lay the overlay board down and apply pressure across the surface. Make sure you have it right as the bond will take very quickly
    5. Repeat until the room is covered

Rapid Bond Spray Adhesive for UFH Overlay Boards

£11.49 inc.VAT

In Stock
SKU: BOND400
Buy Now - Pay with Installments...
Klarna, Paypal
  • Description

    High performance spray adhesive used to bond the XPS, EPS & LoFix overlay floor panels to the subfloor. The spray adhesive is a fast and effective method that greatly reduces install times with no increase to height build up while minimising waste and overuse.

    When laying the overlay board to a wooden subfloor, simply spray the floor and apply the board to the glue, one board at a time. When laying onto wood a single can will cover 5sqm.

    When laying the boards to concrete or similar substrates with a high consumption rate, spray the floor and the underside of the board so you are bonding glue to glue. This method will give 2.5sqm coverage per can.

    Consumption Rate:

    Wooden subfloors: 5sqm/can
    Concrete subfloors: 2.5sqm/can

     

  • Manuals

    1. Prepare the subfloor by clearing all loose debris to ensure a true bond
    2. Read the instruction as stated on the can
    3. If laying the boards onto a wooden subfloor, spray the subfloor where the first board will be laid. If laying onto concrete, spray the back of the overlay board as well as the subfloor
    4. Lay the overlay board down and apply pressure across the surface. Make sure you have it right as the bond will take very quickly
    5. Repeat until the room is covered

Subscribe to our Mailing List

Receive unique offers and special discounts on our products

  • Next Day Delivery
  • 100% Secure Shopping
  • Price Matching
  • Lifetime Warranty
  • 30 Day Returns